Forefront Services was engaged to design and manufacture a hydraulically controlled lifting rig for installing vent fans to the roof of roadway tunnels.
PDFForefront Services was engaged to reverse engineer & fabricate a failed thickener feed pipe that was impacting thickener performance.
PDFForefront Services were engaged to review the existing ROM Bin Pentice liner system and provide recommendations for improvement.
PDFPROJECT: Forefront Services was engaged to carry out repairs to the lower front area of a ROM bin brow.
PDFForefront Services was engaged to install two off 750NB knife gate valves to a flotation cell feed box.
PDFForefront Services was engaged to complete various works associated with the installation of flotation cells & associated infrastructure.
PDFForefront Services was engaged to reverse engineer and fabricate a flotation cell feed box that has failed and requires replacement.
PDFForefront Services was engaged to design and install a dust extraction cover between the crusher top shell and feed box.
PDFForefront Services was engaged to undertake a review of the ore flow through a transfer chute to identify the cause of conveyor top cover premature wear.
PDFWe work across a range of industries, including mining, agriculture and government agencies.